Series 6 is comprised of administrative records and project files collected by Starr during his more than three decades of service to the Bonneville Power Administration. One highlight is the collection of internal reports and correspondence related to the landmark Pacific Northwest/Pacific Southwest high voltage intertie.


33 boxes

Boxes 6.001 - 6.010 (Page: 1 - 10)



6.001.
Bonneville Power Administration - Alaska Power Survey. 1965-1971.
1.1.
Alaska Power Survey Study Committee 4 - Coordinated System Development and Interconnections - Regional Task Forces - correspondence, regional reports. 1965-1967.
1.2.
Alaska Power Survey - reports, newspaper clippings. 1965-1968.
1.3.
"Report to Federal Power Commission Alaska Power Survey Advisory Committee from Subcommittee No. 4 on Coordinated System Development and Interconnection" - initial draft and 2 final drafts. 1967, 1968.
1.4.
"Alaska Power Survey" (Federal Power Commission) - 3 copies. 1969.
1.5.
"Ice Fog Studies in Alaska: A Survey of Past, Present and Proposed Research" (Well, Geophysical Institute). 1969.
1.6.
Alaska Power Survey Advisory Committee and Study Committee No. 4 (Coordinated System Development and Interconnection) - meeting minutes, correspondence, and reports. 1967-1971.

6.002.
Bonneville Power Administration - Alaska Power Survey. 1965-1966, 1968.
2.1.
Alaska Power Survey Advisory Committee and Study Committee No. 4 (Coordinated System Development and Interconnection) - meeting minutes, correspondence, and reports (1/2). 1965.
2.2.
Alaska Power Survey Advisory Committee and Study Committee No. 4 (Coordinated System Development and Interconnection) - meeting minutes, correspondence, and reports (2/2). 1965.
2.3.
Alaska Power Survey Advisory Committee and Study Committee No. 4 (Coordinated System Development and Interconnection) - meeting minutes, correspondence, and reports. 1966.
2.4.
"Coordinated System Development and Interconnection - a Study Prepared for the Federal Power Commission Alaska Power Survey" (Subcommittee No. 4 - Alaska Power Survey Advisory Committee) - final draft. 1968.

6.003.
Bonneville Power Administration - Alaska Power Administration. 1961, 1964-1975, 1981.
3.1.
Rampart Project - Alaska - reconnaissance, correspondence, cost estimates. 1961, 1967.
3.2.
"First Annual Report 1968" (Norwood / Alaska Power Administration). 1969.
3.3.
"Water Power in Alaska - A Bibliography" (Alaska Power Administration) + "Bibliography And Historical Notes 1946-1968 Upper Yukon River Study Canada - United States" (APA). 1969.
3.4.
Alaska Power Administration - transmission studies. 1964-1971.
3.5.
Alaska Power Administration - creation of. 1967-1971.
3.6.
Alaska correspondence. 1965-1975.
3.7.
"A Regional Electric Power System for the Lower Kuskokwim Vicinity - A Preliminary Feasibility Assessment" (Robert W. Retherford Associates). 1975.
3.8.
Alaska Power Authority - Request for Proposals. 1981.

6.004.
Bonneville Power Administration - Snettisham HVDC Transmission Project. 1967-1970.
4.1.
Snettisham Project Alaska - Design Memorandum No. 9 - Transmission Facilities (U.S. Army Corps of Engineers). December 1966.
4.2.
Snettisham Project - Department of the Army - Alaska District Corps of Engineers - GE - Preliminary Information. October 1967.
4.3.
Snettisham Project - location and vicinity maps. 1966-1968.
4.4.
Snettisham Project Alaska - Supplement No. 1 to Design Memorandum No. 9 - Direct Current Transmission (U.S. Army Corps of Engineers). 1968.
4.5.
Snettisham HVDC evaluation. 1967-1970.

6.005.
Bonneville Power Administration - Snettisham HVDC Transmission Project. 1968-1969.
5.1.
"Step I Request for Technical Proposals for HVDC Transmission System at Snettisham, Alaska" - partial copy (U.S. Army Corps of Engineers). October 1968.
5.2.
"Step I Request for Technical Proposals for HVDC Transmission System at Snettisham, Alaska" (U.S. Army Corps of Engineers). December 1968.
5.3.
Snettisham - Pre-proposal Conference - minutes. February 1969.
5.4.
Anchorage HVDC First Stop Proposal Conference - minutes and correspondence. 1969.
5.5.
GE Proposal Document. October 1969.

6.006.
Bonneville Power Administration - Snettisham HVDC Transmission Project. 1967-1970, 1979-1980, undated.
6.1.
Snettisham Project correspondence, data, and studies. 1967-1969.
6.2.
"Transcript of Negotiations for HVDC Transmission System at Snettisham, Alaska between General Electric Company and Corps of Engineers at Anchorage, Alaska 19-23 January 1970".
6.3.
"Snettisham-Ketchikan Transmission System - Preliminary Feasibility Design - Appendix I (Harstad Associates, Inc.). 1979.
6.4.
"Snettisham-Ketchikan Transmission System - Preliminary Feasibility Design (Harstad Associates, Inc.). Mar 1980.
6.5.
"Alaska Power Administration Snettisham-Ketchikan Transmission System - Preliminary Feasibility Design" (Harstad Associates, Inc.). Jan 1980.
6.6.
Westinghouse Proposal for HV-DC Converter Terminal Facilities for Snettisham Project. undated.

6.007.
Bonneville Power Administration - Snettisham HVDC Transmission Project. 1982.
7.1.
"Alaska Power Administration - Reconnaissance Design and Cost Estimate of Submarine DC Electric Power Transmission System in Southeast Alaska - Task D Report" (Teshmont Consultants, Inc.). 1982.
7.2.
U.S. Department of Energy Alaska Power Administration contract with Teshmont Consultants, Inc. 1982.
7.3.
"Alaska Power Administration - Reconnaissance Design and Cost Estimate of DC Transmission in Southeast Alaska - Task A Report". 1982.
7.4.
"Southeast Alaska Intertie DC Transmission System - Reconnaissance Design and Cost Estimate" (Teshmont Consultants, Inc.). November 1982.
7.5.
"Southeast Alaska Intertie DC Transmission System - Reconnaissance Design and Cost Estimate - Appendix I" (Teshmont Consultants, Inc.). November 1982.

6.008.
Bonneville Power Administration - Alberta Export Power Project. 1979-1981.
8.1.
Fording Coal Limited - Export Power Project - Preliminary Benefit-Cost Analysis + 1980 Program (Montreal Engineering Company, Limited). 1979-1980.
8.2.
Alberta Export Power Project - Report of the System Planning Committee. 1980.
8.3.
Alberta Export Power Project - meeting minutes and reports. November 1979 - October 1980.
8.4.
Alberta Export Power Project - meeting minutes and reports. November 1980 - June 1981.

6.009.
Bonneville Power Administration - Itaipu Sete Quedas Transmission Study. 1972-1974.
9.1.
Itaipu - Sete Quedas Transmission Study - Advisory Committee - Minutes and Working Papers. 1972-1973.
9.2.
Itaipu - Sete Quedas Transmission Study - Advisory Committee Meeting No. 3 - Working Papers. 1973.
9.3.
Itaipu - Sete Quedas Transmission Study - Advisory Committee - Minutes and Working Papers. 1974.

6.010.
Bonneville Power Administration - Itaipu Sete Quedas Transmission Study. 1966-1974.
10.1.
Itaipu - Sete Quedas Transmission Study - Transmission Lines - reports, drawings. 1971-1972.
10.2.
"Application of Series Capacitors in the 750 kV Sete Quedas Transmission System - Preliminary Investigation" (Fletcher). 1973.
10.3.
Itaipu - Sete Quedas Transmission Study - Series Capacitors and Overvoltage Studies - papers, meetings, correspondence. 1966-1974.