6.001.
Bonneville Power Administration - Alaska Power
Survey. 1965-1971.
1.1.
Alaska Power Survey Study Committee 4 -
Coordinated System Development and Interconnections - Regional Task
Forces - correspondence, regional reports. 1965-1967.
1.2.
Alaska Power Survey - reports, newspaper
clippings. 1965-1968.
1.3.
"Report to Federal Power Commission Alaska
Power Survey Advisory Committee from Subcommittee No. 4 on Coordinated
System Development and Interconnection" - initial draft and 2 final
drafts. 1967, 1968.
1.4.
"Alaska Power Survey" (Federal Power
Commission) - 3 copies. 1969.
1.5.
"Ice Fog Studies in Alaska: A Survey of Past,
Present and Proposed Research" (Well, Geophysical
Institute). 1969.
1.6.
Alaska Power Survey Advisory Committee and
Study Committee No. 4 (Coordinated System Development and
Interconnection) - meeting minutes, correspondence, and
reports. 1967-1971.
6.002.
Bonneville Power Administration - Alaska Power
Survey. 1965-1966, 1968.
2.1.
Alaska Power Survey Advisory Committee and
Study Committee No. 4 (Coordinated System Development and
Interconnection) - meeting minutes, correspondence, and reports
(1/2). 1965.
2.2.
Alaska Power Survey Advisory Committee and
Study Committee No. 4 (Coordinated System Development and
Interconnection) - meeting minutes, correspondence, and reports
(2/2). 1965.
2.3.
Alaska Power Survey Advisory Committee and
Study Committee No. 4 (Coordinated System Development and
Interconnection) - meeting minutes, correspondence, and
reports. 1966.
2.4.
"Coordinated System Development and
Interconnection - a Study Prepared for the Federal Power Commission
Alaska Power Survey" (Subcommittee No. 4 - Alaska Power Survey Advisory
Committee) - final draft. 1968.
6.003.
Bonneville Power Administration - Alaska Power
Administration. 1961, 1964-1975, 1981.
3.1.
Rampart Project - Alaska - reconnaissance,
correspondence, cost estimates. 1961, 1967.
3.2.
"First Annual Report 1968" (Norwood / Alaska
Power Administration). 1969.
3.3.
"Water Power in Alaska - A Bibliography"
(Alaska Power Administration) + "Bibliography And Historical Notes
1946-1968 Upper Yukon River Study Canada - United States"
(APA). 1969.
3.4.
Alaska Power Administration - transmission
studies. 1964-1971.
3.5.
Alaska Power Administration - creation
of. 1967-1971.
3.6.
Alaska correspondence. 1965-1975.
3.7.
"A Regional Electric Power System for the
Lower Kuskokwim Vicinity - A Preliminary Feasibility Assessment"
(Robert W. Retherford Associates). 1975.
3.8.
Alaska Power Authority - Request for
Proposals. 1981.
6.004.
Bonneville Power Administration - Snettisham
HVDC Transmission Project. 1967-1970.
4.1.
Snettisham Project Alaska - Design Memorandum
No. 9 - Transmission Facilities (U.S. Army Corps of
Engineers). December 1966.
4.2.
Snettisham Project - Department of the Army -
Alaska District Corps of Engineers - GE - Preliminary
Information. October 1967.
4.3.
Snettisham Project - location and vicinity
maps. 1966-1968.
4.4.
Snettisham Project Alaska - Supplement No. 1
to Design Memorandum No. 9 - Direct Current Transmission (U.S. Army
Corps of Engineers). 1968.
4.5.
Snettisham HVDC evaluation. 1967-1970.
6.005.
Bonneville Power Administration - Snettisham
HVDC Transmission Project. 1968-1969.
5.1.
"Step I Request for Technical Proposals for
HVDC Transmission System at Snettisham, Alaska" - partial copy (U.S.
Army Corps of Engineers). October 1968.
5.2.
"Step I Request for Technical Proposals for
HVDC Transmission System at Snettisham, Alaska" (U.S. Army Corps of
Engineers). December 1968.
5.3.
Snettisham - Pre-proposal Conference -
minutes. February 1969.
5.4.
Anchorage HVDC First Stop Proposal Conference
- minutes and correspondence. 1969.
5.5.
GE Proposal Document. October 1969.
6.006.
Bonneville Power Administration - Snettisham
HVDC Transmission Project. 1967-1970, 1979-1980, undated.
6.1.
Snettisham Project correspondence, data, and
studies. 1967-1969.
6.2.
"Transcript of Negotiations for HVDC
Transmission System at Snettisham, Alaska between General Electric
Company and Corps of Engineers at Anchorage, Alaska 19-23
January 1970".
6.3.
"Snettisham-Ketchikan Transmission System -
Preliminary Feasibility Design - Appendix I (Harstad Associates,
Inc.). 1979.
6.4.
"Snettisham-Ketchikan Transmission System -
Preliminary Feasibility Design (Harstad Associates, Inc.). Mar 1980.
6.5.
"Alaska Power Administration
Snettisham-Ketchikan Transmission System - Preliminary Feasibility
Design" (Harstad Associates, Inc.). Jan 1980.
6.6.
Westinghouse Proposal for HV-DC Converter
Terminal Facilities for Snettisham Project. undated.
6.007.
Bonneville Power Administration - Snettisham
HVDC Transmission Project. 1982.
7.1.
"Alaska Power Administration - Reconnaissance
Design and Cost Estimate of Submarine DC Electric Power Transmission
System in Southeast Alaska - Task D Report" (Teshmont Consultants,
Inc.). 1982.
7.2.
U.S. Department of Energy Alaska Power
Administration contract with Teshmont Consultants, Inc. 1982.
7.3.
"Alaska Power Administration - Reconnaissance
Design and Cost Estimate of DC Transmission in Southeast Alaska - Task
A Report". 1982.
7.4.
"Southeast Alaska Intertie DC Transmission
System - Reconnaissance Design and Cost Estimate" (Teshmont
Consultants, Inc.). November 1982.
7.5.
"Southeast Alaska Intertie DC Transmission
System - Reconnaissance Design and Cost Estimate - Appendix I"
(Teshmont Consultants, Inc.). November 1982.
6.008.
Bonneville Power Administration - Alberta Export
Power Project. 1979-1981.
8.1.
Fording Coal Limited - Export Power Project -
Preliminary Benefit-Cost Analysis + 1980 Program (Montreal Engineering
Company, Limited). 1979-1980.
8.2.
Alberta Export Power Project - Report of the
System Planning Committee. 1980.
8.3.
Alberta Export Power Project - meeting minutes
and reports. November 1979 - October 1980.
8.4.
Alberta Export Power Project - meeting minutes
and reports. November 1980 - June 1981.
6.009.
Bonneville Power Administration - Itaipu Sete
Quedas Transmission Study. 1972-1974.
9.1.
Itaipu - Sete Quedas Transmission Study -
Advisory Committee - Minutes and Working Papers. 1972-1973.
9.2.
Itaipu - Sete Quedas Transmission Study -
Advisory Committee Meeting No. 3 - Working Papers. 1973.
9.3.
Itaipu - Sete Quedas Transmission Study -
Advisory Committee - Minutes and Working Papers. 1974.
6.010.
Bonneville Power Administration - Itaipu Sete
Quedas Transmission Study. 1966-1974.
10.1.
Itaipu - Sete Quedas Transmission Study -
Transmission Lines - reports, drawings. 1971-1972.
10.2.
"Application of Series Capacitors in the 750
kV Sete Quedas Transmission System - Preliminary Investigation"
(Fletcher). 1973.
10.3.
Itaipu - Sete Quedas Transmission Study -
Series Capacitors and Overvoltage Studies - papers, meetings,
correspondence. 1966-1974.